Commissioning & Test

As part of the Project Management procedure, a bespoke test procedure will be written and provided as part of the handover documentation to the client.

The procedure may encompass a number of tests, below is a sample of requirements:-

 

SPL performance levels for each zone or defined area

STI (intelligibility) performance figures for each zone or defined area

Loudspeaker circuit test sheets, Impedance, Earth continuity, EOL value etc.

Fire or Emergency Microphone operation tests

Paging microphone tests

Fire Alarm interface tests

Message broadcast equipment (digital message stores)

Redundancy / Network resilience testing

PC operation

Stage-box and multi-core testing

System DSP setting verification and backup file save.

 

 

Whilst this list is not applicable to all projects, it provides a basis to work with and then develop a site specific full test, commission documents. These documents should then be made part of the final handover documents.

 

 

ETASound

ETASound - Introduction

Home

Contact

ETASound - Introduction
ETASound - Contact