Commissioning & Test

 

As part of the Project Management procedure, a bespoke test procedure will be written and provided as part of the handover documentation to the client.

The procedure may encompass a number of tests, below is a sample of requirements:-

  • SPL performance levels for each zone or defined area
  • STI (intelligibillity) performance figures for each zone or defined area
  • Loudspeaker circuit test sheets, Impedance, Earth continuity, EOL value etc.
  • Fire or Emergency Microphone operation tests
  • Paging microphone tests
  • Fire Alarm interface tests
  • Message broadcast equipment (digital mesage stores)
  • Redundancy / Network resilience testing
  • PC operation
  • Stagebox and multicore testing
  • System DSP setting verification and backup file save.

Whilst this list is not aplicable to all projects, it provides a basis to work with and then develop a site specific full test, commission documents. These documents should then be made part of the final handover documents.